AEMO On Air

The role of transmission in the energy transition

Season 1 Episode 2

AEMO's Claire Cass - GM for network projects - explains why Australia needs to build new transmission to connect  renewable energy to the grid, and our meet net-zero targets.

Please note that at 11.46, Claire says 100 kms when she meant to say 100 meters to describe the width of the route for VNI West.

Interviewer: Paul Zennaro

LinkedIn | X | Facebook